Los Angeles Metro Westside Subway Extension

Los Angeles, CA

Scheduled for 2023, the $2.7-billion Purple Line Extension will extend westward for about nine miles with seven new stations. It will provide a high-capacity, high-speed, dependable alternative for those traveling to and from LA’s “second downtown,” including destinations such as Miracle Mile, Beverly Hills, Century City and Westwood.

ANDREGG GEOMATICS is providing design surveys and mapping for the design build team Skanska-Traylor-Shea JV.  Utilizing conventional total station surveys, low altitude, high resolution digital imagery and terrestrial LiDAR.  ANDREGG provides very accurate and detailed 3D mapping of existing conditions and features for the design team. Also surveyed all utility features including overhead wires, manholes, catch basins and vault inverts.